Analysis of the assembling phase of lattice slabs

  • Artur Lenz Sartorti
  • Ana Carolina Fontes
  • Libânio Miranda Pinheiro

Resumo

Lattice slabs are usual in Brazil. They are formed by precast joists with latticed bars on a base of concrete, and a cover of concrete placed at the jobsite. The assembly of the joists and the filling elements is simple and do not require manpower with great skill, presenting low cost-benefit ratio. However, it is precisely in assembling phase that arise questions related to the scaffold support distance. A mistake in the proper positioning can lead to two undesirable situations. In one of them, a small space between the support lines increases the cost of scaffold, and in other an excessive space can generate exaggerated displacements, and even the collapse of the slab in the stage of concreting. The objective of this work is to analyze the bearing capacity of lattice joists in assembling phase, looking for information that is useful in defining the scaffold support distance. Several joists were tested to define the failure modes and heir load bearing capacities. The results allowed to determine equations for calculating the appropriate distance between the support lines of the joists.
Publicado
2013-08-05
Seção
Articles